Drill, Fill & Seal Method of Post Construction is the best way to guarantee less problems with termites in constructed buildings. It must be applied as per following process.
The process is repeated as per the requirement, which our expert team decides based on the soil and surroundings. On the completion of the chemical termite barrier, the chemical emulsion is filled and sealed thereafter. The effect of the teremicide remains for a longer period of time and thereby is highly appreciated by the end users.

Horizontal Barrier Treatment to top surface
Horizontal Barrier Treatment to top surface

Use 12mm bit and drill at 45° above wall skirting
Use dust pan and brush to clean the dust, and collect in dustbin bag.

Vertical Barrier Treatment to Junction
Vertical Barrier Treatment to Junction

Inject diluted chemical in each hole in wall and floor junction (3 rounds)

External Perimeter to Treatment
External Perimeter to Treatment

Insert White Cement in each hole Seal holes in woodwork after injecting chemical Clean the dust in wardrobe after sealing.

Post Construction Termite Manaqement Services

Post Construction Termite Manaqement Services
  1. Drilling holes along external perimeter at an interval of 1 ft. and injecting chemical emulsion into the holes.
  2. Drilling & injecting chemical emulsion along junction of wall & floor at every 1 ft. centre to centre
  3. Treatment of fixed woodwork by drilling and injecting oil based solution
  4. Treatment of live mud tubes by injecting oil base formulation Treatment of door & window frames by drilling & injecting chemical emulsion
  5. Treatment of electric junction boxes